Detalhes do Projeto
FUNCHO DAM AND FUNCHO-FRANQUEIRA WATER CONDUIT (1st SECTION)
Owner: Direcção Geral dos Recursos e Aproveitamentos Hidráulicos
Site: Silves – Portugal
Conclusion year: 1993
Camber dam with double curvature, to irrigation and population water supply.
Crest length: 165 m
Height: 48,8 m
Width: 7 m
Dam volume: 61 050 m3
Hydrographic basin area: 200 km2
Excavation: 100 000 m3
Concrete: 62 000 m3
Reinforcing steel: 700 ton
Formwork: 16 000 m2
Construction of a prestressed concrete pipe.
Pipe Ø 2500: 2 100 ml
Excavations: 230 000 m3
Backfillings: 20 600 m3