Detalhes do Projeto

OUED HARRACH DERIVATION WORKS AND TRANSFER WORKS FROM HARRACH/DOUERA AT WILAYA DE ALGER

Owner: Ministère des Ressources en Eau
ONID – Office National de L’Irrigation et du Drainage

Site: Obras de derivação: Hammam Melouane Wilaya: Blida – Argélia
Obras de transferência: Hammam Melouane – Douéra Wilaya: Blida Alger – Argélia

Conclusion year: 2009

 

Derivation works:

Construction of surface runoff weir, water intake, two decanters, regulation reservoir and hydro mechanical equipment.

 

Transfer works:

Execution of Ø 2000 mm reinforced concrete and PRV piping  over 24km, two pumping stations and hydro mechanical equipment.

 

Earth movement – 800 000 m3

Transport to deposit – 325 000 m3

Formwork – 56 000 m2

Concrete – 65 000 m3

Steel – 4 300 ton

Ø 2000 mm reinforced concrete piping – 5 000 m

Ø 2000 mm PRV piping – 19 000 m

 

Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.

Strictly Necessary Cookies

Strictly Necessary Cookie should be enabled at all times so that we can save your preferences for cookie settings.

3rd Party Cookies

This website uses Google Analytics to collect anonymous information such as the number of visitors to the site, and the most popular pages.

Keeping this cookie enabled helps us to improve our website.