Detalhes do Projeto

WEIR-BRIDGE – MIRANDELA

Client: City Council of Mirandela
Location: River Tua – Mirandela – Portugal
Execution Period: 24 Months

 

Weir-bridge type mobile dam, with 8 spans of 17.5 m, which continues in one of the margins through a metallic viaduct.

Excavation: 40.000 m3
Concrete: 25.000 m3
Rebar cages for concrete: 1.500 tons
Formwork: 30.000 m2
Access ways: 7.500 m2

 

Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.

Strictly Necessary Cookies

Strictly Necessary Cookie should be enabled at all times so that we can save your preferences for cookie settings.

3rd Party Cookies

This website uses Google Analytics to collect anonymous information such as the number of visitors to the site, and the most popular pages.

Keeping this cookie enabled helps us to improve our website.