Detalhes do Projeto
SAO GAFISA – SÃO CAETANO DO SUL/SP INSTALLATION OF BORED PILES, BARRETTE PILES, DIAPHRAGM WALL AND TIE-RODS
Client: Gafisa S.A.
Location: Espaço Cerâmica – São Caetano do Sul – São Paulo – Brasil
Execution Period: 8 Meses
Peripheral containment with diaphragm wall and deep-foundation piles using stabilizing fluid.
Amount of work
400 mm diaphragm wall 10,000 m²
Ø 700 and 800 mm bored piles 3,400 m
Ø 1,200 and 1,500 mm bored piles 4,000 m
2,500 mm barrette piles 2,700 m²
2,800 mm barrette piles 750 m²
Temporary tie-rods 8,300 m