Detalhes do Projeto
SANTA TERESINHA COMPLEX AND RESTORATION OF VIADUCT CASTELO BRANCO
Client: Town Council of Santo André
Localização: Santo André – São Paulo – Brazil
Conclusion Year: work in progress
Execution of 4 Special Engineering Works, called Ramos 100, 200, 300 and 400, 2 bridges located at Rua do Acre and Rua Santa Adélia, improving traffic and the crossing between directions São Paulo / Mauá at Av. dos Estados. The project also comprised the adaptation of the layout and the structural restoration of the viaduct Castelo Branco. All these works aim at the improvement of the traffic flow in the city of Santo André.