Detalhes do Projeto

RIO NOVO DO SUL SUBSTATION

Client: ETC – Empresa Transmissora Capixaba S.A.
Location: Rio Novo do Sul – Espírito Santo – Brazil
Conclusion Year: under construction

Implementation Area: 38,800 square meters
Surface drainage
Deep drainage
Grounding Mesh
Foundations and assembly of poles and Porticos
Foundations of 7 Transformers
Command Buildings
Water-Oil Separation Tank

Main quantities:
Excavation: 5,123 m3
Execution of caissons: 3,790 m
Concrete: 3,237.49 m3
Formwork: 1,4010 m2
Steel: 167 ton
Drainage Pipes: 2,016 m
Pavement: 4,200 m3
Bare copper cable: 16,200 m
Sealing: 3,547 m

Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.

Strictly Necessary Cookies

Strictly Necessary Cookie should be enabled at all times so that we can save your preferences for cookie settings.

3rd Party Cookies

This website uses Google Analytics to collect anonymous information such as the number of visitors to the site, and the most popular pages.

Keeping this cookie enabled helps us to improve our website.