Detalhes do Projeto

REINFORCEMENT OF POWER AT THE HYDROELECTRIC POWER STATION OF SALAMONDE – SALAMONDE II

Owner: EDP – Gestão de Produção de Energia, S.A.
Site: Salamonde – Vieira do Minho – Portugal
Conclusion year: 2015

 

– Water collection (intake) facility at Salamonde reservoir;

–  Underground water supply section;

– Outlet section between the power plant and the connection to the surge tank;

– Surge tank composed by a shaft and respective connection to the outlet tunnel;

– Outlet tunnel and hydraulic circuit draining pit;

– Outlet in the Caniçada reservoir;

– Downstream channel;

– Power plant cave with a reversible hydroelectric set;

– Floodgate chamber and respective well;

– Buses well;

– Supporting building and substation laid out on the surface;

– Water intake and water outlet cofferdams.

 

Tunnels length : 4 779m

Tunnels section : 77m2

Underground excavation: 480 000 m3

Open sky excavation: 281 000 m3

Landfills: 25 000m3

Concrete: 160 000 m3

Drilling: 380 000 m

Grouting’s: 1 701 ton

Iron armour: 7 200 ton

Formwork: 76 000 m2

Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.

Strictly Necessary Cookies

Strictly Necessary Cookie should be enabled at all times so that we can save your preferences for cookie settings.

3rd Party Cookies

This website uses Google Analytics to collect anonymous information such as the number of visitors to the site, and the most popular pages.

Keeping this cookie enabled helps us to improve our website.