Owner: EDP – Gestão da Produção de Energia, S.A.
Site: Montalegre – Portugal
Conclusion year: 2011

 

This Contract Job covers the execution of all civil engineering works, supply and installation of the equipment of the new supplementary flood spillway of the Paradela dam, also comprising, besides all the additional and supplementary works related to it, interventions on the crest of the dam, on electrical installations and equipment associated with the bottom outlet valves, deactivation of the current front spillway by closing its entrance with a concrete structure, and landscaping.

 

Excavation – 123 400 m3

Embankment – 32 150 m3

Reinforced Concrete – 24 400 m3