Detalhes do Projeto
MADEIRA ALPHAVILLE COMPLEX/SP INSTALLATION OF DIAPHRAGM WALL AND TIE-RODS
Client: Madeira SPE Empreendimentos Imobiliários
Location: Barueri – São Paulo – Brasil
Execution Period: 7 months
Peripheral containment with diaphragm wall using stabilizing fluid, pinning it to the rock with temporary tie-rods.
Amount of work:
400 mm diaphragm wall: 1,400 m²
500 mm diaphragm wall: 1,900 m²
Tie-rods: 3,900 m