
Detalhes do Projeto
HYDROELECTRIC POWER PLANT SENHORA DE MONFORTE
Client: Energias Hidroeléctricas, Lda.
Location: Senhora de Monforte – Pinhel – Portugal
Execution Period: 11 Months
Reinforced concrete weir
Capping: 78 lm
Height: 18 lm
Plant with an installed capacity of 9.2 MW
Restitution canal: 250 lm