
Detalhes do Projeto
HYDROELECTRIC POWER PLANT OF LAÚCA
Client: Construtora Norberto Odebrecht, S.A.
Location: Hydroelectric Power Plant of Laúca – Angola
Execution Period: 24 Months
Assembling of metallic structures in the power house (approximately 1.800 tons), assembling of the suction system and pipeline, to connect to the spiral box of the 6 sets of hydraulic turbines .