Detalhes do Projeto

HYDROELECTRIC POWER PLANT OF LAÚCA

Client: Construtora Norberto Odebrecht, S.A.
Location: Hydroelectric Power Plant of Laúca – Angola
Execution Period: 24 Months

 

Assembling of metallic structures in the power house (approximately 1.800 tons), assembling of the suction system and pipeline, to connect to the spiral box of the 6 sets of hydraulic turbines .