Detalhes do Projeto

HYDROELECTRIC POWER PLANT OF FRÁGUAS

Client: Generg – Gestão e Projectos de Energia, S.A.
Location: Vila Nova de Paiva – Viseu – Portugal
Execution Period: 12 Months

 

Concrete weir
Capping: 24 lm
Height: 5 lm
Concrete diversion canal (2,00 x 1,70): 985 lm
Spillway: 230 lm
Plant with an installed capacity of 2,9 MW: 230 m2
Loading chamber
Footings of the pressure conduit

Earthworks: 20.500 m3
Concrete: 3.800 m3
Rebar cages for concrete: 120 tons
Formwork: 11.500 m2