HYDROELECTRIC POWER PLANT OF FRÁGUAS

Client: Generg – Gestão e Projectos de Energia, S.A.
Location: Vila Nova de Paiva – Viseu – Portugal
Execution Period: 12 Months

 

Concrete weir
Capping: 24 lm
Height: 5 lm
Concrete diversion canal (2,00 x 1,70): 985 lm
Spillway: 230 lm
Plant with an installed capacity of 2,9 MW: 230 m2
Loading chamber
Footings of the pressure conduit

Earthworks: 20.500 m3
Concrete: 3.800 m3
Rebar cages for concrete: 120 tons
Formwork: 11.500 m2

 

Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.

Strictly Necessary Cookies

Strictly Necessary Cookie should be enabled at all times so that we can save your preferences for cookie settings.

3rd Party Cookies

This website uses Google Analytics to collect anonymous information such as the number of visitors to the site, and the most popular pages.

Keeping this cookie enabled helps us to improve our website.