Detalhes do Projeto

HOSPITAL SÃO JOÃO CONSTRUCTION, REMODELLING AND EXPANSION OF THE SOUTH-WEST AND SOUTH-EAST WINGS

Client: Hospital de São João
Location: Porto – Portugal
Execution Period: 22 Months

 

The project comprised two different parts scheduled as follows:
Construction, remodelling and expansion of the south-west and south-east wings of Hospital São João.
Execution of 3 buildings in reinforced concrete structure on top of an existing structure. Structural reinforcement of the foundations and pillars of the building to be expanded. Building exterior finished with “Capotto” finishing and aluminium sashes and frames. The indoor coating is mostly vinyl in walls and pavements, and the ceilings are painted “Pladur”. The inner walls are masonry walls. In the remodelled area, the “kernel” of the different floors / services were demolished and they were reconstructed using the same sort of finishes of the newly built part. The project also includes the execution of the special installations.

South-west wing:
Number of floors: 11 (8 storeys + 3 underground)
South-east wing:
Number of floors: 9 storeys
Eastern wing:
Number of floors: 5 storeys

Area under intervention 33.350 m2
Characteristics of the hospital: 1.037 hospitalisation beds

 

Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.

Strictly Necessary Cookies

Strictly Necessary Cookie should be enabled at all times so that we can save your preferences for cookie settings.

3rd Party Cookies

This website uses Google Analytics to collect anonymous information such as the number of visitors to the site, and the most popular pages.

Keeping this cookie enabled helps us to improve our website.