Detalhes do Projeto

FREIXO BRIDGE

Client: Junta Autónoma de Estradas
Location: Porto – Portugal
Execution Period: 38 Months
Conclusion Year: 1997

 

Construction of the prestressed reinforced concrete road bridge, with double deck, and access viaduct on the left margin. 

Total length of the bridge: 705 lm 
Central Span of the Bridge: 150 lm 
Cased Piles Ø 500 mm: 600 lm 
Cased Piles Ø 600 mm: 2.930 lm 
Cased Piles Ø 1.000 mm: 165 lm 
Cased Piles Ø 1.500 mm: 1.600 lm 
Sheet Piles:  39.100 m2 
Concrete: 39.700 m³ 
Concrete Rebar Cages: 4.837 tons 
Formwork: 97.250 m2 
Prestress: 181.600.000 kN.m