FREIXO BRIDGE

Client: Junta Autónoma de Estradas
Location: Porto – Portugal
Execution Period: 38 Months
Conclusion Year: 1997

 

Construction of the prestressed reinforced concrete road bridge, with double deck, and access viaduct on the left margin. 

Total length of the bridge: 705 lm 
Central Span of the Bridge: 150 lm 
Cased Piles Ø 500 mm: 600 lm 
Cased Piles Ø 600 mm: 2.930 lm 
Cased Piles Ø 1.000 mm: 165 lm 
Cased Piles Ø 1.500 mm: 1.600 lm 
Sheet Piles:  39.100 m2 
Concrete: 39.700 m³ 
Concrete Rebar Cages: 4.837 tons 
Formwork: 97.250 m2 
Prestress: 181.600.000 kN.m 

 

Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.

Strictly Necessary Cookies

Strictly Necessary Cookie should be enabled at all times so that we can save your preferences for cookie settings.

3rd Party Cookies

This website uses Google Analytics to collect anonymous information such as the number of visitors to the site, and the most popular pages.

Keeping this cookie enabled helps us to improve our website.