Detalhes do Projeto

ENCUMEADA TUNNEL

Client: Regional Secretariat of Social Equipment; Environment Regional Directorate of Roads
Location: Serra d’Água – Madeira – Portugal
Execution Period: 36 Months

 

Construction of a bi-directional road tunnel between Ribeira Brava and São Vicente, with a length of 3.086 meters, a cross-section of excavation which ranges from 66 m2 to 89 m2, with provisional and definitive coating of reinforced concrete, including pavements and drainages.

Excavation: 206.883 m³
Concrete: 32.362 m³
Steel: 2.499 tons
Rockbolting: 8.086 units
Bituminous concrete: 21.000 m2