Detalhes do Projeto

D. LUÍS BRIDGE
RESTORATION OF THE SUPERSTRUCTURE

Client: EP – Estradas de Portugal S.A.
Location: Santarém – Portugal
Execution Period: 6 Months

 

Repair of the superficial and deep concrete; 
Installation of expansion joints with openings ranging from 80 cm to 3 cm, with movements of 1 cm up to 14 cm; 
Waterproofing of the full surface of the bridge’s deck; 
Pavement and signage; 
Installation of lighting in the bridge; 
Repair of drainpipes. 

 

Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.

Strictly Necessary Cookies

Strictly Necessary Cookie should be enabled at all times so that we can save your preferences for cookie settings.

3rd Party Cookies

This website uses Google Analytics to collect anonymous information such as the number of visitors to the site, and the most popular pages.

Keeping this cookie enabled helps us to improve our website.