HOSPITAL DISTRITAL DA COVA DA BEIRA

Client: Ministry of Health
Location: Covilhã – Portugal
Execution Period: 27 Months

 

Capacity: 262 beds
Number of floors: 7
Floor area: 43.750 m2
Plot area: 54.570 m2
Roof area: 10.835 m2

Earthworks: 170.000 m3
Concrete (B25): 17.080 m3
Steel (A500): 1.950 tons
Masonries: 83.250 m2

Supply and assembling of all hospital equipment

Laboratories: 1.660 m2
Transformer station 1.500/380 V
Transformers 800 kVA: 3 unit
Emergency Power Generator 500 kVA: 2 unit
Lifts: 10 unit
Thermal Central, air conditioning, heating and ventilation
Boilers 1.500.000 Kcal/h: 3 unit
Chillers 696 Kw: 2 unit
Centralised technical management
Water and Sewage Network
Supply central
Firefighting Central
Reserve and Stabilisation Tank: 300 m2
Hot water tanks 4.000 l: 3 unit
Waste water and industrial water treatment plant
Treatment of all waters
Medical gases (oxygen, vacuum, nitrous oxide and compressed air)
Kitchen (1.296 daily meals), Laundry (250 kg clothes per hour)
Sterilisation central (steam, hot air and ethylene oxide autoclave)
Security, fire detection and combat

 

Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.

Strictly Necessary Cookies

Strictly Necessary Cookie should be enabled at all times so that we can save your preferences for cookie settings.

3rd Party Cookies

This website uses Google Analytics to collect anonymous information such as the number of visitors to the site, and the most popular pages.

Keeping this cookie enabled helps us to improve our website.