COSTA DO ESTORIL SEWAGE SYSTEM
COSTA DO ESTORIL INTERCEPTOR (2ND PHASE)

Client: Sanest – Saneamento da Costa do Estoril, S.A.
Location: Linda-a-Pastora/Carnaxide/Barcarena/Caxias/Oeiras – Portugal
Execution Period: 24 Months

 

Sewage interceptor composed of 5 tunnels and 4 in-between tunnels crossing, with a length of approximately 10 Km.

Excavation: 154.316 m³
Moulded concrete: 55.712 m³
Shotcrete: 21.032 m³
Average cross-section of the tunnels: 10 m2

 

Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.

Strictly Necessary Cookies

Strictly Necessary Cookie should be enabled at all times so that we can save your preferences for cookie settings.

3rd Party Cookies

This website uses Google Analytics to collect anonymous information such as the number of visitors to the site, and the most popular pages.

Keeping this cookie enabled helps us to improve our website.