CONTRACT FOR THE INSTALLATION
OF THE TRACK SUPERSTRUCTURE
OF WEST-EAST INTEGRATION RAILWAY (“FERROVIA INTEGRAÇÃO OESTE – LESTE” – FIOL) PROJECT – LOT 3
Client: TORC – Terraplanagem Obras Rodoviárias Construções Ltda.
Location: Tanhaçú – Bahia – Brasil
Conclusion Year: 2014
Installation of the track superstructure along approximately 116 km of continuous track and in 8 yards, including the installation of switches and crossings, resulting in an overall installation of 131 km of track, 1,600 mm gauge with UIC 60 rail, monoblock concrete sleepers and 16 opening switches, optimized 1:14..