Detalhes do Projeto
DAM AND POWER STATION OF CERCOSA
Client: Generg – Gestão e Projectos de Energia, S.A.
Location: Vouzela – Portugal
Conclusion Year: 1992
This project comprised the construction of a concrete dam.
Relevant data:
- Crest length: 72 ml
- Height: 15,7 ml
- Concrete channel (section 2.70m x 1.50m): 1 600 ml
- Power station for a turbine to 4 MW: 130 m2
- Pressure shaft
- Supports of penstock
- Earthworks: 36 200 m2
- Concrete: 9 000 m3
- Reinforcing steel: 220 tn
- Formwork: 17 900 m2