Detalhes do Projeto

DAM AND POWER STATION OF CERCOSA

Client: Generg – Gestão e Projectos de Energia, S.A.
Location: Vouzela – Portugal
Conclusion Year: 1992

This project comprised the construction of a concrete dam.

Relevant data:

  • Crest length: 72 ml
  • Height: 15,7 ml
  • Concrete channel (section 2.70m x 1.50m): 1 600 ml
  • Power station for a turbine to 4 MW: 130 m2
  • Pressure shaft
  • Supports of penstock

     

  • Earthworks: 36 200 m2
  • Concrete: 9 000 m3
  • Reinforcing steel: 220 tn
  • Formwork: 17 900 m2