Detalhes do Projeto
CONSTRUCTION OF THE BRIDGE DAULE–GUAYAQUIL, INCLUDING ACCESS WAYS AND VIADUCTS
Client: Autonomous Decentralised Government of the Municipalities of Guayaquil, Samborondon and Daule
Location: Guayaquil – Ecuador
Conclusion Year: work in progress
Construction of the bridge Daule – Guayaquil, with a length of 540 meters over river Daule, composed of 9 spans of 60m each and a clearance of approximately 7m.
The foundations are composed of round metallic piles, driven into the rocky bed, with D=1500mm and thick.=38mm.
Metallic deck with a width of 26,6 meters, being each span composed of 9 metallic beams of variable web, on which lay the prestressed reinforced concrete pre-slabs and a compression blade of reinforced concrete.
On the margin of the Guayaquil, it will be built the Cierro Colorado viaduct, with 270 meters of total span, maintaining the bridge structural solution: a mixed structure of reinforced concrete with prestressed pre-slabs.
On the margin of the Daule, it will be built the La Joya viaduct, with 108 meters of total span, maintaining the structural solution of the Cierro Colorado viaduct: a mixed structure of reinforced concrete with prestressed pre-slabs.
Several road section will be built connection the two viaducts to the bridge, including drainages, earthworks, retaining walls, finishes, signage, lighting and acoustic barriers.
Main quantities:
– Metallic structure with structural steel A588: 3.500 tons
– Structural steel for pier-piles ASTM A-588: 2.500 tons
– EPS for backfilling areas: 38.000 m³
– Steel bars Fy=4200kg/cm²: 2.200 tons
– Structural concrete fc=350kg/cm²: 13.500 m²
– Structural steel for pier-piles ASTM A-588: 1.200 tons
– Metallic structure with structural steel A588: 1.000 tons
– Pier-piles, installation in the river: 1.700 m
– Acoustic barriers: 4.200 m²
– Surface layer: 71.000 m²