Detalhes do Projeto
CONSTRUCTION AND PAVING OF THE MG-230 HIGHWAY
Client: Departamento de Estradas de Rodagem de Minas Gerais – DER/MG
Location: Serra do Salitre/Rio Paranaíba – Minas Gerais – Brasil
Conclusion year: 2016
Improvement and paving works on the section from Serra do Salitre to the River Paranaíba and bypass of the River Paranaíba on the MG-230 Highway.
Length: 57.01 km