
Detalhes do Projeto
CONSTRUCTION AND PAVING OF THE BR-364/MG HIGHWAY
Client: Departamento Nacional de Infraestrutura de Transportes – DNIT
Location: Santa Vitória e Gurinhatã – Minas Gerais – Brasil
Conclusion year: 2013
Construction and paving works on the BR-364/MG Highway.
Length: 75.6 km