Detalhes do Projeto
CONSTRUCTION AND PAVING OF THE BR-135/MG HIGHWAY
Client: Departamento Nacional de Infraestrutura de Transportes – DNIT
Location: Montalvânia – Minas Gerais – Brasil
Conclusion year: 2013
Construction of the BR-135/MG Highway. Section: Div. BA/MG – BR-030 Junction (Montalvânia). Segment – km 0.00 – km 18.10.
Length: 18.10 km