Detalhes do Projeto

COIMBRA CENTRAL HOSPITAL

Client: New Coimbra Central Hospital Bureau
Location: Rua de Tomar – Coimbra – Portugal
Execution Period: 72 Months

 

Capacity: 1.208 beds

Civil Works:
Floor area: 115.000 m2
Roof area: 23.000 m2
Excavation: 300.000 m2
Concrete: 50.000 m2
Rebar cages for concrete: 2.300 tons
Masonries: 180.000 m2

Laboratories: 3.440 m2

Electrical network:
Air conditioned, heating and ventilation
Water and sewage network
Lifts: 24 units

Kitchens:
Laundry: 1.600 kg/h
Incineration: 1.000 kg/h

Centralised dust aspiration
Pneumatic transport of documents
Security, fire detection and combat
Water treatment
Medical gases
Sterilisation

 

Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.

Strictly Necessary Cookies

Strictly Necessary Cookie should be enabled at all times so that we can save your preferences for cookie settings.

3rd Party Cookies

This website uses Google Analytics to collect anonymous information such as the number of visitors to the site, and the most popular pages.

Keeping this cookie enabled helps us to improve our website.