
Detalhes do Projeto
CAJU SMALL HYDROELECTRIC PLANT (SHP)
Client: Energisa Soluções S.A.
Location: São Sebastião do Alto / Santa Maria Madalena – Rio de Janeiro – Brazil
Conclusion Year: 2011
Construction of the Caju SHP, with an installed capacity of 10 MW, located on the River Grande, in the municipalities of São Sebastião do Alto and Santa Maria Madalena/RJ.