Detalhes do Projeto
BYPASS TO E.N.10 (2ND PHASE) – SANTA IRIA DA AZOIA VIADUCT
Client: Junta Autónoma de Estradas
Location: Santa Iria da Azóia – Portugal
Execution Period: 11 Months
The viaduct is composed of two prestressed reinforced concrete twin-decks, with a length of 1.888 meters, and an average width of 13 meters for each deck. Most of the foundations are deep foundations (Ø 1.500 mm piles), being the foundations shallow in the end zone. The structural solution is composed of pier-pile, with a pile-capping beam on which lay precast beams.