Detalhes do Projeto
BRIDGE OVER THE SANTA JOANA RIVER
STRUCTURAL REHABILITATION
Client: Vale S.A.
Location: Colatina – Espírito Santo – Brazil
Execution Period : 10 Months
– Development of final Designs;
– Inspections, tests and surveys;
– Reinforcement of the abutments;
– Installation of a new steel bridge;
– Replacement of the existing bridge;
– Dismantling of the existing bridge;