
Detalhes do Projeto
BRIDGE OVER THE MOUTH OF SOUSA
REHABILITATION AND REINFORCEMENT
Client: EP – Estradas de Portugal S.A.
Location: Gondomar – Portugal
Execution Period: 8 Months
Concrete repair;
Injection of cracks with epoxy resin;
Concrete protection painting;
Installation of expansion joints;
Deck waterproofing and paving;
Installation of handrails and guardrails.