Detalhes do Projeto

BRIDGE OVER SANTA MARIA RIVER
STRUCTURAL REHABILITATION

Client: Vale S.A.
Location: Serra/Santa Leopoldina – Espírito Santo – Brazil
Execution Period: 14 Meses

 

– Development of final Designs;
– Inspections, tests and surveys;
– Rehabilitation and reinforcement of the abutments;
– Installation of new steel bridges;
– Replacement of existing bridges;
– Dismantling of existing bridges;
– River bank protection;
– Return to initial conditions.