Detalhes do Projeto
BOUTACA BRIDGE
STRUCTURAL REHABILITATION
Client: Instituto Português do Patrimônio Arquitetónico – IPPAR
Location: Batalha – Portugal
Execution Period: 8 Months
Restoration of renders;
– Masonry restoration;
– Construction of the drainage system;
– Electrical installations and lighting of the bridge;
– Cobblestone paving;
– Carpentry work;
– Joinery work;
– Structural reinforcement with stainless steel tie rod.