Detalhes do Projeto
ARRÁBIDA BRIDGE
REHABILITATION
Client: Infraestruturas de Portugal, S.A.
Location: Porto – Portugal
Execution Period: 16 months
Conclusion Year: 2002
Execution of the repair and structural rehabilitation works, namely:
General protection;
Local repair of the reinforced concrete elements;
Treatment of cracks;
Repair of the piers over the bows;
Waterproofing of the decks berms and new coating;
Replacement of the expansion joints;
Reconfiguration of the drainage system;
Rehabilitation of the kerbs, side-walks, guardrails and lamps;
Lighting, electric and communication installations;
Monitoring plan;
Rehabilitation of the pilasters;
Rehabilitation of the abutments;
Rehabilitation of the logos;
Intervention in the bows;
Fencing and other metal works.