Detalhes do Projeto

ARRÁBIDA BRIDGE
REHABILITATION

Client: Infraestruturas de Portugal, S.A.
Location: Porto – Portugal
Execution Period: 16 months
Conclusion Year: 2002

 

Execution of the repair and structural rehabilitation works, namely: 
General protection;
Local repair of the reinforced concrete elements;
Treatment of cracks; 
Repair of the piers over the bows; 
Waterproofing of the decks berms and new coating; 
Replacement of the expansion joints; 
Reconfiguration of the drainage system; 
Rehabilitation of the kerbs, side-walks, guardrails and lamps; 
Lighting, electric and communication installations; 
Monitoring plan; 
Rehabilitation of the pilasters; 
Rehabilitation of the abutments; 
Rehabilitation of the logos; 
Intervention in the bows; 
Fencing and other metal works.

 

Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.

Strictly Necessary Cookies

Strictly Necessary Cookie should be enabled at all times so that we can save your preferences for cookie settings.

3rd Party Cookies

This website uses Google Analytics to collect anonymous information such as the number of visitors to the site, and the most popular pages.

Keeping this cookie enabled helps us to improve our website.