ANTAS VIADUCT 

Client: Brisa – Autoestradas de Portugal, S.A.
Location: A10 Arruda dos Vinhos – Portugal
Conclusion Year: 2006

 

Construction of the viaduct São Sebastião, Motorway A10Bucelas / Carregado / IP3, Arruda dos Vinhos, PortugalPrestressed reinforced concrete viaduct, composed of two independent parallel structures, one for each direction of the traffic, with 7 spans totalling 245 meters, with a deck formed by two frame rails, cross beams over the piers and to surface slab. The piers have a V shape and shallow foundations. The deck was fully executed in situ, span by span, using falsework supported by metallic truss beams, full or half span, born by metallic towers with foundations on the ground. 

Concrete: 10.672 m³
Formwork: 21.090 m2
Passive Rebar Cages (A 500 NR):  1.546.999 Kg/f
Prestress Rebar Cages: 82.779 Kg/f

 

Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.

Strictly Necessary Cookies

Strictly Necessary Cookie should be enabled at all times so that we can save your preferences for cookie settings.

3rd Party Cookies

This website uses Google Analytics to collect anonymous information such as the number of visitors to the site, and the most popular pages.

Keeping this cookie enabled helps us to improve our website.