
Detalhes do Projeto
ALTA VISTA PREMIUM I JUNDIAÍ/SP INSTALLATION OF BORED PILES
Client: Schahin Engenharia
Location: Av. Nove de Julho, 1.330 – Jundiaí – São Paulo – Brasil
Execution Period: 1,5 months
Installation of bored piles using stabilizing fluid.
Amount of work
Ø 700 and 1,000 mm piles 550 m
Ø 1,200 to 1,400 0 mm piles 1,800 m