Detalhes do Projeto

ALGER MOTORWAY
CONSTRUCTION OF THE SECOND SECTION BETWEEN BOUDOUAOU AND ZERALDA

Owner: AGA – Algérienne de Gestion des Autoroutes
Site: Boudouaou / Zeralda Sul – Alger – Algeria
Conclusion year: 2014

 

Construction of 65 km road with highway profile, with 16 road knots and 63 viaducts.

Earthworks (26% excavation and 74% of borrowed landfill);

Headers and hydraulic passages with average diameters of 1200 to 2000mm;

White and black paving (crusher run and bituminous);

Horizontal, vertical traffic and information signalling;

Acoustic screens and retention basins.

 

Viaducts

  • RC viaducts with prefabricated and pre-stressed beams;
  • Mixed structure viaducts (metal and RC structure);
  • Reinforced concrete and reinforced earth retaining walls;
  • Single span upper and lower passages;

 

Earthworks

  • Topsoil regulation 2 010 000 m2
  • Excavations (soils of any nature) 3 981 000 m3
  • Landfill with borrowed material 11 300 000 m3

 

Drainages

  • Excavation in ditch 36 700 m3
  • Channels and scapes 113 910 m
  • RC piping – DN 300 to 2000mm 15 300 m
  • 1200mm hydraulic passages 180 un

Paving

  • Granular material base layer 1 430 200 m3
  • Bituminous layer – binder 776 300 ton
  • Bituminous layer – wear 305 800 ton

 

Road signalling

  • Horizontal markers 521 751 m
  • Safety railing 267 780 m
  • Vertical signalling 1 347 un

 

Viaducts

  • Ø 1200mm Piles 24 000 m
  • Structural concrete 117 130 m3
  • Steel in reinforced concrete 16 920 ton
  • Pre-stressed steel 724 ton
  • Steel in metal structures 6 260 ton
  • Bearings 1 139 un