Client: TDF – Sociedade Gestora de Fundos de Investimento Imobiliário, S.A.
Location: E.N. 249 – Abrunheira – Sintra – Portugal
Execution Period: 10 Months

 

Execution of sanitation infrastructures, street and urban layout. Finishes, technical installations and connection of infrastructures to public networks and alteration of industrial constructions. The structure of the building’s roof is composed of existing metallic structures that were fully restored and painted, coated with double galvanised trapezoidal metallic sheet 5 mm thick.

The park is composed of:
16 warehouses of 450 m2
4 warehouses of 600 m2
4 warehouses of 1200 m2

Earthworks: 16.207 m3
Concrete: 785 m3
Steel: 57 tons
Formwork: 4.916 m2
Masonries: 9.424 m2
Plastering: 5.932 m2
Painting: 8.917 m2
Bituminous pavement: 14.083 m2
Grass: 9.183 m2
Façade cladding with metallic sheet: 6.160 m2
Roof with double metallic sheet + rock wool: 15.780 m2

 

Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.

Strictly Necessary Cookies

Strictly Necessary Cookie should be enabled at all times so that we can save your preferences for cookie settings.

3rd Party Cookies

This website uses Google Analytics to collect anonymous information such as the number of visitors to the site, and the most popular pages.

Keeping this cookie enabled helps us to improve our website.