Detalhes do Projeto

A41 – BRIDGE OVER RIVER SOUSA I

Client: DLACE, ACE
Location: AE Douro Litoral – A41 – Rio Sousa – Portugal
Conclusion Year: 2010

 

Construction of the bridge over river Sousa I;  a bridge with a length of 310 meters executed using the successive launching method, with 3 spans: two free spans of 90 meters and a free span of 130 meters, with a maximum height of 100 meters measured from the average water level of river Sousa. 

Main indicators: 

Deck surface (4.873 m3 of reinforced concrete): 10.447 m2 
Steel A 500 NR: 1.750 tons 
High resistance steel for the prestress: 515 tons 
Formwork: 39.100 m2 
Concrete: 18.780 m³ 
Trestles and falsework: 15.000 m³ 

 

Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.

Strictly Necessary Cookies

Strictly Necessary Cookie should be enabled at all times so that we can save your preferences for cookie settings.

3rd Party Cookies

This website uses Google Analytics to collect anonymous information such as the number of visitors to the site, and the most popular pages.

Keeping this cookie enabled helps us to improve our website.