Detalhes do Projeto
WEIR-BRIDGE – MIRANDELA
Client: City Council of Mirandela
Location: River Tua – Mirandela – Portugal
Execution Period: 24 Months
Weir-bridge type mobile dam, with 8 spans of 17.5 m, which continues in one of the margins through a metallic viaduct.
Excavation: 40.000 m3
Concrete: 25.000 m3
Rebar cages for concrete: 1.500 tons
Formwork: 30.000 m2
Access ways: 7.500 m2