Detalhes do Projeto

ENCUMEADA TUNNEL

Client: Regional Secretariat of Social Equipment; Environment Regional Directorate of Roads
Location: Serra d’Água – Madeira – Portugal
Execution Period: 36 Months

 

Construction of a bi-directional road tunnel between Ribeira Brava and São Vicente, with a length of 3.086 meters, a cross-section of excavation which ranges from 66 m2 to 89 m2, with provisional and definitive coating of reinforced concrete, including pavements and drainages.

Excavation: 206.883 m³
Concrete: 32.362 m³
Steel: 2.499 tons
Rockbolting: 8.086 units
Bituminous concrete: 21.000 m2

 

Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.

Strictly Necessary Cookies

Strictly Necessary Cookie should be enabled at all times so that we can save your preferences for cookie settings.

3rd Party Cookies

This website uses Google Analytics to collect anonymous information such as the number of visitors to the site, and the most popular pages.

Keeping this cookie enabled helps us to improve our website.