Detalhes do Projeto

A41 – BRIDGE OVER RIVER SOUSA I

Client: DLACE, ACE
Location: AE Douro Litoral – A41 – Rio Sousa – Portugal
Conclusion Year: 2010

 

Construction of the bridge over river Sousa I;  a bridge with a length of 310 meters executed using the successive launching method, with 3 spans: two free spans of 90 meters and a free span of 130 meters, with a maximum height of 100 meters measured from the average water level of river Sousa. 

Main indicators: 

Deck surface (4.873 m3 of reinforced concrete): 10.447 m2 
Steel A 500 NR: 1.750 tons 
High resistance steel for the prestress: 515 tons 
Formwork: 39.100 m2 
Concrete: 18.780 m³ 
Trestles and falsework: 15.000 m³