Detalhes do Projeto
INTERNATIONAL BRIDGE OVER GUADIANA RIVER
Client: Junta Autónoma de Estradas
Location: Castro Marim – Portugal
Execution Period: 47 Months
Conclusion Year: 1991
Cable stayed reinforced concrete bridge over Guadiana river
– Total length: 666 lm
– Central Span: 324 lm
– Cased Piles Ø 2000: 2.200 lm
– Sheet Piles: 3.200 m²
– Concrete: 28.000 m³
– Concrete Rebar Cages: 3.853 tons
– Formwork: 46.200 m²
– Prestress: 8.222.000 tfm
– Tie-rods: 675 tons
– Vibro-driving: 117.000 m³