Detalhes do Projeto
DONIM BRIDGE
STRUCTURAL REHABILITATION
Client: Município de Guimarães
Location: Guimarães – Portugal
Execution Period: 6 Meses
– Reconstruction of a masonry arch;
– Treatment of joints in stone structures;
– Structural reinforcement and consolidation;
– Granite block paving;
– Installation of decorative public lighting;
– Installation of the drainage system.