Detalhes do Projeto

MORIAH HOSPITAL – REFURBISHMENT WITH EXPANSION AND CONSTRUCTION OF NEW ANNEX BUILDING

Client: Rede Moriah Saúde Ltda.
Location: Avenida Moaci, 974 – Moema – São Paulo/SP – Brasil
Conclusion year: Work in progress

 

Refurbishment without expansion of area (existing areas – internal): 614 square meters (total)
– Adjustments for interconnection of the new lift tower (Underground Floor/ Ground Floor/ 1st floor): 130 square meters
– Refurbishment of the Surgical Center (1st floor): 181.50 square meters
– Refurbishment of the Executive Board, Self-Care, IT areas (2nd floor – Solarium): 302.50 square meters
New construction with the expansion of the built area (new areas): 1,787 square meters (total)
– Inpatient Admission Sector: 18.00 square meters (projection area of the lift tower)
– Expansion of the Ground Floor:
– Administrative Area in “open-offce”: 188.50 square meters
– Projection Area of 1st floor with fresh-air mode / interconnection with current Building Body: 170.50 square meters
– Expansion of 1st floor – Surgical Center: 359 square meters
– Expansion of the technical area in the Surgical Center (2nd floor – Solarium): 359 square meters
– Expansion of the Inpatient Admission Sector and Executive Board area in the 2nd floor (Solarium): 692 square meters

 

Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.

Strictly Necessary Cookies

Strictly Necessary Cookie should be enabled at all times so that we can save your preferences for cookie settings.

3rd Party Cookies

This website uses Google Analytics to collect anonymous information such as the number of visitors to the site, and the most popular pages.

Keeping this cookie enabled helps us to improve our website.