Detalhes do Projeto

CONTRACT FOR THE INSTALLATION
OF THE TRACK SUPERSTRUCTURE
OF WEST-EAST INTEGRATION RAILWAY (“FERROVIA INTEGRAÇÃO OESTE – LESTE” – FIOL) PROJECT – LOT 3

 

Client: TORC – Terraplanagem Obras Rodoviárias Construções Ltda.
Location: Tanhaçú – Bahia – Brasil
Conclusion Year: 2014

 

Installation of the track superstructure along approximately 116 km of continuous track and in 8 yards, including the installation of switches and crossings, resulting in an overall installation of 131 km of track, 1,600 mm gauge with UIC 60 rail, monoblock concrete sleepers and 16 opening switches, optimized 1:14..

 

Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.

Strictly Necessary Cookies

Strictly Necessary Cookie should be enabled at all times so that we can save your preferences for cookie settings.

3rd Party Cookies

This website uses Google Analytics to collect anonymous information such as the number of visitors to the site, and the most popular pages.

Keeping this cookie enabled helps us to improve our website.