Detalhes do Projeto
STATION PARADA INGLESA REAL ESTATE DEVELOPMENT – INSTALLATION OF DIAPHRAGM WALL
Client: Gafisa S.A.
Location: São Paulo – São Paulo – Brasil
Execution Period: 1 month
Peripheral containment with a 400 mm diaphragm wall stabilized by stabilizing fluid (polymer), totaling 3,700 m².