Detalhes do Projeto

RIO NOVO DO SUL SUBSTATION

Client: ETC – Empresa Transmissora Capixaba S.A.
Location: Rio Novo do Sul – Espírito Santo – Brazil
Conclusion Year: under construction

Implementation Area: 38,800 square meters
Surface drainage
Deep drainage
Grounding Mesh
Foundations and assembly of poles and Porticos
Foundations of 7 Transformers
Command Buildings
Water-Oil Separation Tank

Main quantities:
Excavation: 5,123 m3
Execution of caissons: 3,790 m
Concrete: 3,237.49 m3
Formwork: 1,4010 m2
Steel: 167 ton
Drainage Pipes: 2,016 m
Pavement: 4,200 m3
Bare copper cable: 16,200 m
Sealing: 3,547 m