Detalhes do Projeto

SÃO SEBASTIÃO DO ALTO SMALL HYDROELECTRIC PLANT (SHP)

Client: Energisa Soluções S.A.
Location: São Sebastião do Alto / Santa Maria Madalena – Rio de Janeiro – Brazil
Conclusion Year: 2011

Construction of the São Sebastião do Alto SHP, with an installed capacity of 13 MW, located on the River Grande, in the municipalities of São Sebastião do Alto and Santa Maria Madalena/RJ.