{"id":17177,"date":"2024-09-30T10:51:37","date_gmt":"2024-09-30T10:51:37","guid":{"rendered":"https:\/\/teixeiraduarteconstrucao.com\/?post_type=tm_portfolio&#038;p=17177"},"modified":"2024-09-30T10:51:37","modified_gmt":"2024-09-30T10:51:37","slug":"new-bridge-over-river-limpopo-in-chokwe-guija-mozambique","status":"publish","type":"tm_portfolio","link":"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/new-bridge-over-river-limpopo-in-chokwe-guija-mozambique\/","title":{"rendered":"New Bridge over River Limpopo in Chokwe Guij\u00e1 &#8211; Mozambique"},"content":{"rendered":"<h1>NEW BRIDGE OVER RIVER LIMPOPO IN CHOKWE \/ GUIJ\u00c1 &#8211; MOZAMBIQUE<\/h1>\n<p><strong>Client<\/strong>: ANE \u2013\u00a0National Roads Administration<br \/>\n<strong>Location<\/strong>: Chokwe \u2013 Guij\u00e1 \u2013 Gaza \u2013 Mozambique<br \/>\n<strong>Execution Period<\/strong>: 24 Months<\/p>\n<p>&nbsp;<\/p>\n<p>Construction of the new bridge over river Limpopo, in Chokwe\/Guij\u00e1. This bridge connects both margins of Limpopo river, near Guij\u00e1; almost perpendicular to the margins, the bridge has a full length of 490 m. It has one single continuous reinforced concrete deck, closed frame section (caisson type), with a width of 12 m , accommodating both directions of the road traffic, as well as the two autonomous pedestrian paths. The deck spans the river with 11 points of support, two in both ends (abutments) and nine intermediate (piers); the end spans have a length of 45 m and the intermediate ones 50m. The support points have a height ranging from 3 m to 15 m above the ground level. The foundations are all deep foundations (piles), with full length definitive metal casing (approximately 35m). Each support point is built on top of the pile cap. On top of the pile cap was built the deck\u2019s support structure, walls and beams (abutments) or piers (intermediate support points). The foundations were executed by vibro-driving the metal casing and concreting using the tremie method. The piles caps were executed following the excavation down to the bottom benchmark, roighly 4m below the natural ground level; in some cases, it was previously installed a cofferdam using sheet piles. The piers were built using climbing formwork, concreting progressively sections of 4m until the concreting of the pier cap. The deck was precast in 21 segments, with two concreting phases for each segment with a current length equal to 25m, in a specific site built behind the West abutment (Chokwe side); it was sequentially prestressed and then launched to the left margin of the Limpopo river, using high capacity hydraulic equipment, gliding on top of special bearings placed on all support points and guided through the placement of metallic structure called launching nose on its frontal section.<\/p>\n<p>Concrete: 7.000 m\u00b3<br \/>\nConcrete C4050 in decks: 3.900 m\u00b3<br \/>\nConcrete C3545 in footings and elevations: 1.800 m\u00b3<br \/>\nConcrete C3545 in piles: 1.300 m\u00b3<br \/>\nSteel A450: 900 tons<br \/>\nInner prestress (adherent) in strand: 150 tons<br \/>\nOuter prestress in strand: 45 ton<br \/>\nInner prestress (adherent) in bars: 8 tons<\/p>\n<p>&nbsp;<\/p>\n<div id='gallery-1' class='gallery galleryid-17177 gallery-columns-2 gallery-size-large'><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/2007-Ponte-sobre-o-Rio-Limpopo-4-scaled.jpg'><img decoding=\"async\" width=\"847\" height=\"635\" data-src=\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/2007-Ponte-sobre-o-Rio-Limpopo-4-1024x768.jpg\" class=\"attachment-large size-large lazyload\" alt=\"\" data-srcset=\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/2007-Ponte-sobre-o-Rio-Limpopo-4-1024x768.jpg 1024w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/2007-Ponte-sobre-o-Rio-Limpopo-4-300x225.jpg 300w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/2007-Ponte-sobre-o-Rio-Limpopo-4-768x576.jpg 768w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/2007-Ponte-sobre-o-Rio-Limpopo-4-1536x1152.jpg 1536w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/2007-Ponte-sobre-o-Rio-Limpopo-4-2048x1536.jpg 2048w\" data-sizes=\"(max-width: 847px) 100vw, 847px\" data-id=\"17168\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" style=\"--smush-placeholder-width: 847px; --smush-placeholder-aspect-ratio: 847\/635;\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/2007-Ponte-sobre-o-Rio-Limpopo-1-scaled.jpg'><img decoding=\"async\" width=\"847\" height=\"635\" data-src=\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/2007-Ponte-sobre-o-Rio-Limpopo-1-1024x768.jpg\" class=\"attachment-large size-large lazyload\" alt=\"\" data-srcset=\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/2007-Ponte-sobre-o-Rio-Limpopo-1-1024x768.jpg 1024w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/2007-Ponte-sobre-o-Rio-Limpopo-1-300x225.jpg 300w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/2007-Ponte-sobre-o-Rio-Limpopo-1-768x576.jpg 768w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/2007-Ponte-sobre-o-Rio-Limpopo-1-1536x1152.jpg 1536w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/2007-Ponte-sobre-o-Rio-Limpopo-1-2048x1536.jpg 2048w\" data-sizes=\"(max-width: 847px) 100vw, 847px\" data-id=\"17170\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" style=\"--smush-placeholder-width: 847px; --smush-placeholder-aspect-ratio: 847\/635;\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/2007-Ponte-sobre-o-Rio-Limpopo-2-scaled.jpg'><img decoding=\"async\" width=\"847\" height=\"635\" data-src=\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/2007-Ponte-sobre-o-Rio-Limpopo-2-1024x768.jpg\" class=\"attachment-large size-large lazyload\" alt=\"\" data-srcset=\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/2007-Ponte-sobre-o-Rio-Limpopo-2-1024x768.jpg 1024w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/2007-Ponte-sobre-o-Rio-Limpopo-2-300x225.jpg 300w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/2007-Ponte-sobre-o-Rio-Limpopo-2-768x576.jpg 768w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/2007-Ponte-sobre-o-Rio-Limpopo-2-1536x1152.jpg 1536w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/2007-Ponte-sobre-o-Rio-Limpopo-2-2048x1536.jpg 2048w\" data-sizes=\"(max-width: 847px) 100vw, 847px\" data-id=\"17172\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" style=\"--smush-placeholder-width: 847px; --smush-placeholder-aspect-ratio: 847\/635;\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/2007-Ponte-sobre-o-Rio-Limpopo-3-scaled.jpg'><img decoding=\"async\" width=\"847\" height=\"635\" data-src=\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/2007-Ponte-sobre-o-Rio-Limpopo-3-1024x768.jpg\" class=\"attachment-large size-large lazyload\" alt=\"\" data-srcset=\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/2007-Ponte-sobre-o-Rio-Limpopo-3-1024x768.jpg 1024w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/2007-Ponte-sobre-o-Rio-Limpopo-3-300x225.jpg 300w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/2007-Ponte-sobre-o-Rio-Limpopo-3-768x576.jpg 768w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/2007-Ponte-sobre-o-Rio-Limpopo-3-1536x1152.jpg 1536w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/2007-Ponte-sobre-o-Rio-Limpopo-3-2048x1536.jpg 2048w\" data-sizes=\"(max-width: 847px) 100vw, 847px\" data-id=\"17174\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" style=\"--smush-placeholder-width: 847px; --smush-placeholder-aspect-ratio: 847\/635;\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/2007-Ponte-sobre-o-Rio-Limpopo-5-scaled.jpg'><img decoding=\"async\" width=\"847\" height=\"635\" data-src=\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/2007-Ponte-sobre-o-Rio-Limpopo-5-1024x768.jpg\" class=\"attachment-large size-large lazyload\" alt=\"\" data-srcset=\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/2007-Ponte-sobre-o-Rio-Limpopo-5-1024x768.jpg 1024w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/2007-Ponte-sobre-o-Rio-Limpopo-5-300x225.jpg 300w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/2007-Ponte-sobre-o-Rio-Limpopo-5-768x576.jpg 768w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/2007-Ponte-sobre-o-Rio-Limpopo-5-1536x1152.jpg 1536w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/2007-Ponte-sobre-o-Rio-Limpopo-5-2048x1536.jpg 2048w\" data-sizes=\"(max-width: 847px) 100vw, 847px\" data-id=\"17176\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" style=\"--smush-placeholder-width: 847px; --smush-placeholder-aspect-ratio: 847\/635;\" \/><\/a>\n\t\t\t<\/div><\/figure>\n\t\t<\/div>\n\n","protected":false},"featured_media":17174,"template":"","projects":[329,336],"skills":[331,337],"countries":[333,408],"class_list":["post-17177","tm_portfolio","type-tm_portfolio","status-publish","has-post-thumbnail","hentry","tm_portfolio_category-bridges-and-viaducts","projects-all","projects-bridges-and-viaducts","skills-all","skills-infrastructures","countries-all","countries-mozambique"],"metadata":{"_wpml_word_count":"{\"total\":0,\"to_translate\":{\"en\":2,\"pt-pt\":2}}","_edit_lock":"1727693499:12","_edit_last":"12","_thumbnail_id":"17174","_reactive_geobox_preview":"{}","_wpml_media_has_media":"1","_themetechmount_metabox_group":{"slidertype":"","revslider":"home_PT","customslider":"","slider_width":"wide","custom_background":{"image":"","imageid":"","repeat":"","position":"","attachment":"","size":"","color":""},"custom_inner_background":{"image":"","imageid":"","repeat":"","position":"","attachment":"","size":"","color":""},"show_topbar":"","topbar_bg_color":"","topbar_bg_custom_color":"#dd3333","topbar_text_color":"","topbar_text_custom_color":"rgba(0, 0, 255, 0.25)","topbar_left_text":"","topbar_right_text":"","title":"","subtitle":"","titlebar_bg_custom_options":"custom","titlebar_bg_color":"darkgrey","titlebar_background":{"image":"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/2007-Ponte-sobre-o-Rio-Limpopo-2-scaled.jpg","imageid":"17172","repeat":"","position":"center top","attachment":"fixed","size":"cover","color":""},"titlebar_font_custom_options":"","titlebar_text_color":"white","titlebar_heading_font":{"family":"Arimo","backup-family":"Arial, Helvetica, sans-serif","variant":"regular","text-transform":"","font-size":"14","line-height":"16","letter-spacing":"0","color":"#202020","font":"google"},"titlebar_subheading_font":{"family":"Arimo","backup-family":"Arial, Helvetica, sans-serif","variant":"regular","text-transform":"","font-size":"14","line-height":"16","letter-spacing":"0","color":"#202020","font":"google"},"titlebar_breadcrumb_font":{"family":"Arimo","backup-family":"Arial, Helvetica, sans-serif","variant":"regular","text-transform":"","font-size":"14","line-height":"16","letter-spacing":"0","color":"#202020","font":"google"},"titlebar_view":"","titlebar_height":"","titlebar_hide_breadcrumb":"","skincolor":"","custom_background_switcher":false,"hide_titlebar":false},"_themetechmount_metabox_sidebar":{"sidebar":"","left_sidebar":"","right_sidebar":""},"themetechmount_page_row_settings":{"row_lower_padding":false},"themetechmount_portfolio_featured":{"featuredtype":"image","video_code":"","audio_code":"","slide_images":""},"themetechmount_portfolio_view":{"viewstyle":""},"themetechmount_portfolio_like":"","_wpb_vc_js_status":"false","_wpml_media_duplicate":"1","_wpml_media_featured":"1","_last_translation_edit_mode":"native-editor","_yoast_wpseo_primary_tm_portfolio_category":"","_yoast_wpseo_content_score":"30","_yoast_wpseo_estimated-reading-time-minutes":"3","_yoast_wpseo_wordproof_timestamp":"","themetechmount_likes":"0","_wpb_post_custom_layout":"default","_reuseb_geobox_preview":"{}","_yoast_wpseo_primary_projects":"","_yoast_wpseo_primary_skills":"","_yoast_wpseo_primary_countries":"408","_wp_old_date":"2024-09-27"},"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.7 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>New Bridge over River Limpopo in Chokwe Guij\u00e1 - Mozambique - Teixeira Duarte Constru\u00e7\u00e3o<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/new-bridge-over-river-limpopo-in-chokwe-guija-mozambique\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"New Bridge over River Limpopo in Chokwe Guij\u00e1 - Mozambique - Teixeira Duarte Constru\u00e7\u00e3o\" \/>\n<meta property=\"og:description\" content=\"NEW BRIDGE OVER RIVER LIMPOPO IN CHOKWE \/ GUIJ\u00c1 &#8211; MOZAMBIQUE Client: ANE \u2013\u00a0National Roads Administration Location: Chokwe \u2013 Guij\u00e1 \u2013 Gaza \u2013 Mozambique Execution Period: 24 Months &nbsp; Construction of the new bridge over river Limpopo, in Chokwe\/Guij\u00e1. This bridge connects both margins of Limpopo river, near Guij\u00e1; almost perpendicular to the margins, the &hellip; Continue reading New Bridge over River Limpopo in Chokwe Guij\u00e1 &#8211; Mozambique\" \/>\n<meta property=\"og:url\" content=\"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/new-bridge-over-river-limpopo-in-chokwe-guija-mozambique\/\" \/>\n<meta property=\"og:site_name\" content=\"Teixeira Duarte Constru\u00e7\u00e3o\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/teixeiraduarteconstrucao\/?locale=pt_PT\" \/>\n<meta property=\"og:image\" content=\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/2007-Ponte-sobre-o-Rio-Limpopo-3-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1920\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/new-bridge-over-river-limpopo-in-chokwe-guija-mozambique\/\",\"url\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/new-bridge-over-river-limpopo-in-chokwe-guija-mozambique\/\",\"name\":\"New Bridge over River Limpopo in Chokwe Guij\u00e1 - Mozambique - Teixeira Duarte Constru\u00e7\u00e3o\",\"isPartOf\":{\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/new-bridge-over-river-limpopo-in-chokwe-guija-mozambique\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/new-bridge-over-river-limpopo-in-chokwe-guija-mozambique\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/2007-Ponte-sobre-o-Rio-Limpopo-3-scaled.jpg\",\"datePublished\":\"2024-09-30T10:51:37+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/new-bridge-over-river-limpopo-in-chokwe-guija-mozambique\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/new-bridge-over-river-limpopo-in-chokwe-guija-mozambique\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/new-bridge-over-river-limpopo-in-chokwe-guija-mozambique\/#primaryimage\",\"url\":\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/2007-Ponte-sobre-o-Rio-Limpopo-3-scaled.jpg\",\"contentUrl\":\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/2007-Ponte-sobre-o-Rio-Limpopo-3-scaled.jpg\",\"width\":2560,\"height\":1920},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/new-bridge-over-river-limpopo-in-chokwe-guija-mozambique\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"In\u00edcio\",\"item\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"New Bridge over River Limpopo in Chokwe Guij\u00e1 &#8211; Mozambique\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/#website\",\"url\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/\",\"name\":\"Teixeira Duarte Constru\u00e7\u00e3o\",\"description\":\"Pioneirismo e Inova\u00e7\u00e3o desde 1921\",\"publisher\":{\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/#organization\",\"name\":\"Teixeira Duarte - Engenharia e Constru\u00e7\u00f5es, S.A.\",\"url\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2025\/04\/Logotipo-Teixeira-Duarte-EC-2024-positivo.png\",\"contentUrl\":\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2025\/04\/Logotipo-Teixeira-Duarte-EC-2024-positivo.png\",\"width\":3544,\"height\":1182,\"caption\":\"Teixeira Duarte - Engenharia e Constru\u00e7\u00f5es, S.A.\"},\"image\":{\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/teixeiraduarteconstrucao\/?locale=pt_PT\",\"https:\/\/www.linkedin.com\/company\/teixeira-duarte-engenharia-e-construcoes\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"New Bridge over River Limpopo in Chokwe Guij\u00e1 - Mozambique - Teixeira Duarte Constru\u00e7\u00e3o","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/new-bridge-over-river-limpopo-in-chokwe-guija-mozambique\/","og_locale":"en_US","og_type":"article","og_title":"New Bridge over River Limpopo in Chokwe Guij\u00e1 - Mozambique - Teixeira Duarte Constru\u00e7\u00e3o","og_description":"NEW BRIDGE OVER RIVER LIMPOPO IN CHOKWE \/ GUIJ\u00c1 &#8211; MOZAMBIQUE Client: ANE \u2013\u00a0National Roads Administration Location: Chokwe \u2013 Guij\u00e1 \u2013 Gaza \u2013 Mozambique Execution Period: 24 Months &nbsp; Construction of the new bridge over river Limpopo, in Chokwe\/Guij\u00e1. This bridge connects both margins of Limpopo river, near Guij\u00e1; almost perpendicular to the margins, the &hellip; Continue reading New Bridge over River Limpopo in Chokwe Guij\u00e1 &#8211; Mozambique","og_url":"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/new-bridge-over-river-limpopo-in-chokwe-guija-mozambique\/","og_site_name":"Teixeira Duarte Constru\u00e7\u00e3o","article_publisher":"https:\/\/www.facebook.com\/teixeiraduarteconstrucao\/?locale=pt_PT","og_image":[{"width":2560,"height":1920,"url":"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/2007-Ponte-sobre-o-Rio-Limpopo-3-scaled.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/new-bridge-over-river-limpopo-in-chokwe-guija-mozambique\/","url":"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/new-bridge-over-river-limpopo-in-chokwe-guija-mozambique\/","name":"New Bridge over River Limpopo in Chokwe Guij\u00e1 - Mozambique - Teixeira Duarte Constru\u00e7\u00e3o","isPartOf":{"@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/new-bridge-over-river-limpopo-in-chokwe-guija-mozambique\/#primaryimage"},"image":{"@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/new-bridge-over-river-limpopo-in-chokwe-guija-mozambique\/#primaryimage"},"thumbnailUrl":"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/2007-Ponte-sobre-o-Rio-Limpopo-3-scaled.jpg","datePublished":"2024-09-30T10:51:37+00:00","breadcrumb":{"@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/new-bridge-over-river-limpopo-in-chokwe-guija-mozambique\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/new-bridge-over-river-limpopo-in-chokwe-guija-mozambique\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/new-bridge-over-river-limpopo-in-chokwe-guija-mozambique\/#primaryimage","url":"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/2007-Ponte-sobre-o-Rio-Limpopo-3-scaled.jpg","contentUrl":"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/2007-Ponte-sobre-o-Rio-Limpopo-3-scaled.jpg","width":2560,"height":1920},{"@type":"BreadcrumbList","@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/new-bridge-over-river-limpopo-in-chokwe-guija-mozambique\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"In\u00edcio","item":"https:\/\/teixeiraduarteconstrucao.com\/en\/"},{"@type":"ListItem","position":2,"name":"New Bridge over River Limpopo in Chokwe Guij\u00e1 &#8211; Mozambique"}]},{"@type":"WebSite","@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/#website","url":"https:\/\/teixeiraduarteconstrucao.com\/en\/","name":"Teixeira Duarte Constru\u00e7\u00e3o","description":"Pioneirismo e Inova\u00e7\u00e3o desde 1921","publisher":{"@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/teixeiraduarteconstrucao.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/#organization","name":"Teixeira Duarte - Engenharia e Constru\u00e7\u00f5es, S.A.","url":"https:\/\/teixeiraduarteconstrucao.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2025\/04\/Logotipo-Teixeira-Duarte-EC-2024-positivo.png","contentUrl":"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2025\/04\/Logotipo-Teixeira-Duarte-EC-2024-positivo.png","width":3544,"height":1182,"caption":"Teixeira Duarte - Engenharia e Constru\u00e7\u00f5es, S.A."},"image":{"@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/teixeiraduarteconstrucao\/?locale=pt_PT","https:\/\/www.linkedin.com\/company\/teixeira-duarte-engenharia-e-construcoes"]}]}},"_links":{"self":[{"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/tm_portfolio\/17177","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/tm_portfolio"}],"about":[{"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/types\/tm_portfolio"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/media\/17174"}],"wp:attachment":[{"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/media?parent=17177"}],"wp:term":[{"taxonomy":"projects","embeddable":true,"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/projects?post=17177"},{"taxonomy":"skills","embeddable":true,"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/skills?post=17177"},{"taxonomy":"countries","embeddable":true,"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/countries?post=17177"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}