{"id":17050,"date":"2024-09-30T08:38:05","date_gmt":"2024-09-30T08:38:05","guid":{"rendered":"https:\/\/teixeiraduarteconstrucao.com\/?post_type=tm_portfolio&#038;p=17050"},"modified":"2024-09-30T08:38:05","modified_gmt":"2024-09-30T08:38:05","slug":"rehabilitation-of-the-eastern-mole-of-the-port-of-tavira","status":"publish","type":"tm_portfolio","link":"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/rehabilitation-of-the-eastern-mole-of-the-port-of-tavira\/","title":{"rendered":"Rehabilitation of the Eastern Mole of the Port of Tavira"},"content":{"rendered":"<h1>REHABILITATION OF THE EASTERN MOLE OF THE PORT OF TAVIRA<\/h1>\n<p><strong>Client<\/strong>: DGRM \u2013 Directorate General of Natural Resources, Security and Maritime Services<br \/>\n<strong>Location<\/strong>: Island of Cabanas \u2013 Tavira \u2013 Portugal<br \/>\n<strong>Execution Period<\/strong>: 14 Months<\/p>\n<p>&nbsp;<\/p>\n<p>Execution of the maritime works for the rehabilitation of the eastern mole of Tavira port. Dredging of sand and rockfill, execution of foundations in rockfill prisms to support the mole\u2019s resistant layers, prefabrication of 150 kN \u201cAntifer\u201d blocks and adequate placement in the mole\u2019s head, removal of 96 kN \u201cTetrapods\u201d from the mole\u2019s head and placement in the body and coating of the entrance canal with a mat of selected rockfill. The total length of the mole is approximately 350 meters; the intervention occurred in the last 50 meters. The works were carried out from level -15,00m (ZH) to the capping level +5,00m (ZH). The project was carried out in the island Cabanas de Tavira and all the equipment and material was transported using a barge and a tugboat between Tavira and the provisional quay built in the island.<\/p>\n<p>Main quantities:<\/p>\n<p>Dredging: 7.000 m\u00b3<br \/>\nRemoval of rockfill: 1.840 m\u00b3<br \/>\n\u201cAntifer\u201d concrete blocks: 1.600 m\u00b3<br \/>\nHandling of \u201cTetrapods\u201d: 300 unit<br \/>\nPlacement of \u201cAntifer\u201d blocks: 257 unit<br \/>\nSupply and application of rockfill: 10.500 m\u00b3<\/p>\n<p>&nbsp;<\/p>\n<div id='gallery-1' class='gallery galleryid-17050 gallery-columns-1 gallery-size-large'><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/DGRNSS_REABILITACAO-DO-MOLHE-NASCENTE-DA-BARRA-DA-TAVIRA_PORTUGAL-scaled.jpg'><img decoding=\"async\" width=\"847\" height=\"565\" data-src=\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/DGRNSS_REABILITACAO-DO-MOLHE-NASCENTE-DA-BARRA-DA-TAVIRA_PORTUGAL-1024x683.jpg\" class=\"attachment-large size-large lazyload\" alt=\"\" data-srcset=\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/DGRNSS_REABILITACAO-DO-MOLHE-NASCENTE-DA-BARRA-DA-TAVIRA_PORTUGAL-1024x683.jpg 1024w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/DGRNSS_REABILITACAO-DO-MOLHE-NASCENTE-DA-BARRA-DA-TAVIRA_PORTUGAL-300x200.jpg 300w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/DGRNSS_REABILITACAO-DO-MOLHE-NASCENTE-DA-BARRA-DA-TAVIRA_PORTUGAL-768x512.jpg 768w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/DGRNSS_REABILITACAO-DO-MOLHE-NASCENTE-DA-BARRA-DA-TAVIRA_PORTUGAL-1536x1024.jpg 1536w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/DGRNSS_REABILITACAO-DO-MOLHE-NASCENTE-DA-BARRA-DA-TAVIRA_PORTUGAL-2048x1365.jpg 2048w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/DGRNSS_REABILITACAO-DO-MOLHE-NASCENTE-DA-BARRA-DA-TAVIRA_PORTUGAL-1200x800.jpg 1200w\" data-sizes=\"(max-width: 847px) 100vw, 847px\" data-id=\"17049\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" style=\"--smush-placeholder-width: 847px; --smush-placeholder-aspect-ratio: 847\/565;\" \/><\/a>\n\t\t\t<\/div><\/figure>\n\t\t<\/div>\n\n","protected":false},"featured_media":17049,"template":"","projects":[329,388],"skills":[331,397,330],"countries":[333,332],"class_list":["post-17050","tm_portfolio","type-tm_portfolio","status-publish","has-post-thumbnail","hentry","tm_portfolio_category-marine-and-river-infrastructures","projects-all","projects-marine-and-river-infrastructures","skills-all","skills-marine-works","skills-rehabilitation","countries-all","countries-portugal-en"],"metadata":{"_wpml_word_count":"{\"total\":0,\"to_translate\":{\"en\":2,\"pt-pt\":2}}","_edit_lock":"1727685355:12","_edit_last":"12","_thumbnail_id":"17049","_reactive_geobox_preview":"{}","_wpml_media_has_media":"1","_themetechmount_metabox_group":{"slidertype":"","revslider":"home_PT","customslider":"","slider_width":"wide","custom_background":{"image":"","imageid":"","repeat":"","position":"","attachment":"","size":"","color":""},"custom_inner_background":{"image":"","imageid":"","repeat":"","position":"","attachment":"","size":"","color":""},"show_topbar":"","topbar_bg_color":"","topbar_bg_custom_color":"#dd3333","topbar_text_color":"","topbar_text_custom_color":"rgba(0, 0, 255, 0.25)","topbar_left_text":"","topbar_right_text":"","title":"","subtitle":"","titlebar_bg_custom_options":"custom","titlebar_bg_color":"darkgrey","titlebar_background":{"image":"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/DGRNSS_REABILITACAO-DO-MOLHE-NASCENTE-DA-BARRA-DA-TAVIRA_PORTUGAL-scaled.jpg","imageid":"17049","repeat":"no-repeat","position":"center top","attachment":"fixed","size":"cover","color":""},"titlebar_font_custom_options":"","titlebar_text_color":"white","titlebar_heading_font":{"family":"Arimo","backup-family":"Arial, Helvetica, sans-serif","variant":"regular","text-transform":"","font-size":"14","line-height":"16","letter-spacing":"0","color":"#202020","font":"google"},"titlebar_subheading_font":{"family":"Arimo","backup-family":"Arial, Helvetica, sans-serif","variant":"regular","text-transform":"","font-size":"14","line-height":"16","letter-spacing":"0","color":"#202020","font":"google"},"titlebar_breadcrumb_font":{"family":"Arimo","backup-family":"Arial, Helvetica, sans-serif","variant":"regular","text-transform":"","font-size":"14","line-height":"16","letter-spacing":"0","color":"#202020","font":"google"},"titlebar_view":"","titlebar_height":"","titlebar_hide_breadcrumb":"","skincolor":"","custom_background_switcher":false,"hide_titlebar":false},"_themetechmount_metabox_sidebar":{"sidebar":"","left_sidebar":"","right_sidebar":""},"themetechmount_page_row_settings":{"row_lower_padding":false},"themetechmount_portfolio_featured":{"featuredtype":"image","video_code":"","audio_code":"","slide_images":""},"themetechmount_portfolio_view":{"viewstyle":""},"themetechmount_portfolio_like":"","_wpb_vc_js_status":"false","_wpml_media_duplicate":"1","_wpml_media_featured":"1","_last_translation_edit_mode":"native-editor","_yoast_wpseo_primary_tm_portfolio_category":"","_yoast_wpseo_content_score":"30","_yoast_wpseo_estimated-reading-time-minutes":"2","_yoast_wpseo_wordproof_timestamp":"","themetechmount_likes":"0","_wpb_post_custom_layout":"default","_reuseb_geobox_preview":"{}","_yoast_wpseo_primary_projects":"","_yoast_wpseo_primary_skills":"330","_yoast_wpseo_primary_countries":""},"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.7 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Rehabilitation of the Eastern Mole of the Port of Tavira - Teixeira Duarte Constru\u00e7\u00e3o<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/rehabilitation-of-the-eastern-mole-of-the-port-of-tavira\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Rehabilitation of the Eastern Mole of the Port of Tavira - Teixeira Duarte Constru\u00e7\u00e3o\" \/>\n<meta property=\"og:description\" content=\"REHABILITATION OF THE EASTERN MOLE OF THE PORT OF TAVIRA Client: DGRM \u2013 Directorate General of Natural Resources, Security and Maritime Services Location: Island of Cabanas \u2013 Tavira \u2013 Portugal Execution Period: 14 Months &nbsp; Execution of the maritime works for the rehabilitation of the eastern mole of Tavira port. Dredging of sand and rockfill, &hellip; Continue reading Rehabilitation of the Eastern Mole of the Port of Tavira\" \/>\n<meta property=\"og:url\" content=\"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/rehabilitation-of-the-eastern-mole-of-the-port-of-tavira\/\" \/>\n<meta property=\"og:site_name\" content=\"Teixeira Duarte Constru\u00e7\u00e3o\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/teixeiraduarteconstrucao\/?locale=pt_PT\" \/>\n<meta property=\"og:image\" content=\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/DGRNSS_REABILITACAO-DO-MOLHE-NASCENTE-DA-BARRA-DA-TAVIRA_PORTUGAL-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1707\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/rehabilitation-of-the-eastern-mole-of-the-port-of-tavira\/\",\"url\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/rehabilitation-of-the-eastern-mole-of-the-port-of-tavira\/\",\"name\":\"Rehabilitation of the Eastern Mole of the Port of Tavira - Teixeira Duarte Constru\u00e7\u00e3o\",\"isPartOf\":{\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/rehabilitation-of-the-eastern-mole-of-the-port-of-tavira\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/rehabilitation-of-the-eastern-mole-of-the-port-of-tavira\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/DGRNSS_REABILITACAO-DO-MOLHE-NASCENTE-DA-BARRA-DA-TAVIRA_PORTUGAL-scaled.jpg\",\"datePublished\":\"2024-09-30T08:38:05+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/rehabilitation-of-the-eastern-mole-of-the-port-of-tavira\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/rehabilitation-of-the-eastern-mole-of-the-port-of-tavira\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/rehabilitation-of-the-eastern-mole-of-the-port-of-tavira\/#primaryimage\",\"url\":\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/DGRNSS_REABILITACAO-DO-MOLHE-NASCENTE-DA-BARRA-DA-TAVIRA_PORTUGAL-scaled.jpg\",\"contentUrl\":\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/DGRNSS_REABILITACAO-DO-MOLHE-NASCENTE-DA-BARRA-DA-TAVIRA_PORTUGAL-scaled.jpg\",\"width\":2560,\"height\":1707},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/rehabilitation-of-the-eastern-mole-of-the-port-of-tavira\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"In\u00edcio\",\"item\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Rehabilitation of the Eastern Mole of the Port of Tavira\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/#website\",\"url\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/\",\"name\":\"Teixeira Duarte Constru\u00e7\u00e3o\",\"description\":\"Pioneirismo e Inova\u00e7\u00e3o desde 1921\",\"publisher\":{\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/#organization\",\"name\":\"Teixeira Duarte - Engenharia e Constru\u00e7\u00f5es, S.A.\",\"url\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2025\/04\/Logotipo-Teixeira-Duarte-EC-2024-positivo.png\",\"contentUrl\":\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2025\/04\/Logotipo-Teixeira-Duarte-EC-2024-positivo.png\",\"width\":3544,\"height\":1182,\"caption\":\"Teixeira Duarte - Engenharia e Constru\u00e7\u00f5es, S.A.\"},\"image\":{\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/teixeiraduarteconstrucao\/?locale=pt_PT\",\"https:\/\/www.linkedin.com\/company\/teixeira-duarte-engenharia-e-construcoes\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Rehabilitation of the Eastern Mole of the Port of Tavira - Teixeira Duarte Constru\u00e7\u00e3o","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/rehabilitation-of-the-eastern-mole-of-the-port-of-tavira\/","og_locale":"en_US","og_type":"article","og_title":"Rehabilitation of the Eastern Mole of the Port of Tavira - Teixeira Duarte Constru\u00e7\u00e3o","og_description":"REHABILITATION OF THE EASTERN MOLE OF THE PORT OF TAVIRA Client: DGRM \u2013 Directorate General of Natural Resources, Security and Maritime Services Location: Island of Cabanas \u2013 Tavira \u2013 Portugal Execution Period: 14 Months &nbsp; Execution of the maritime works for the rehabilitation of the eastern mole of Tavira port. Dredging of sand and rockfill, &hellip; Continue reading Rehabilitation of the Eastern Mole of the Port of Tavira","og_url":"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/rehabilitation-of-the-eastern-mole-of-the-port-of-tavira\/","og_site_name":"Teixeira Duarte Constru\u00e7\u00e3o","article_publisher":"https:\/\/www.facebook.com\/teixeiraduarteconstrucao\/?locale=pt_PT","og_image":[{"width":2560,"height":1707,"url":"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/DGRNSS_REABILITACAO-DO-MOLHE-NASCENTE-DA-BARRA-DA-TAVIRA_PORTUGAL-scaled.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/rehabilitation-of-the-eastern-mole-of-the-port-of-tavira\/","url":"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/rehabilitation-of-the-eastern-mole-of-the-port-of-tavira\/","name":"Rehabilitation of the Eastern Mole of the Port of Tavira - Teixeira Duarte Constru\u00e7\u00e3o","isPartOf":{"@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/rehabilitation-of-the-eastern-mole-of-the-port-of-tavira\/#primaryimage"},"image":{"@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/rehabilitation-of-the-eastern-mole-of-the-port-of-tavira\/#primaryimage"},"thumbnailUrl":"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/DGRNSS_REABILITACAO-DO-MOLHE-NASCENTE-DA-BARRA-DA-TAVIRA_PORTUGAL-scaled.jpg","datePublished":"2024-09-30T08:38:05+00:00","breadcrumb":{"@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/rehabilitation-of-the-eastern-mole-of-the-port-of-tavira\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/rehabilitation-of-the-eastern-mole-of-the-port-of-tavira\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/rehabilitation-of-the-eastern-mole-of-the-port-of-tavira\/#primaryimage","url":"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/DGRNSS_REABILITACAO-DO-MOLHE-NASCENTE-DA-BARRA-DA-TAVIRA_PORTUGAL-scaled.jpg","contentUrl":"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/DGRNSS_REABILITACAO-DO-MOLHE-NASCENTE-DA-BARRA-DA-TAVIRA_PORTUGAL-scaled.jpg","width":2560,"height":1707},{"@type":"BreadcrumbList","@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/rehabilitation-of-the-eastern-mole-of-the-port-of-tavira\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"In\u00edcio","item":"https:\/\/teixeiraduarteconstrucao.com\/en\/"},{"@type":"ListItem","position":2,"name":"Rehabilitation of the Eastern Mole of the Port of Tavira"}]},{"@type":"WebSite","@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/#website","url":"https:\/\/teixeiraduarteconstrucao.com\/en\/","name":"Teixeira Duarte Constru\u00e7\u00e3o","description":"Pioneirismo e Inova\u00e7\u00e3o desde 1921","publisher":{"@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/teixeiraduarteconstrucao.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/#organization","name":"Teixeira Duarte - Engenharia e Constru\u00e7\u00f5es, S.A.","url":"https:\/\/teixeiraduarteconstrucao.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2025\/04\/Logotipo-Teixeira-Duarte-EC-2024-positivo.png","contentUrl":"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2025\/04\/Logotipo-Teixeira-Duarte-EC-2024-positivo.png","width":3544,"height":1182,"caption":"Teixeira Duarte - Engenharia e Constru\u00e7\u00f5es, S.A."},"image":{"@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/teixeiraduarteconstrucao\/?locale=pt_PT","https:\/\/www.linkedin.com\/company\/teixeira-duarte-engenharia-e-construcoes"]}]}},"_links":{"self":[{"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/tm_portfolio\/17050","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/tm_portfolio"}],"about":[{"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/types\/tm_portfolio"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/media\/17049"}],"wp:attachment":[{"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/media?parent=17050"}],"wp:term":[{"taxonomy":"projects","embeddable":true,"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/projects?post=17050"},{"taxonomy":"skills","embeddable":true,"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/skills?post=17050"},{"taxonomy":"countries","embeddable":true,"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/countries?post=17050"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}