{"id":16992,"date":"2024-09-30T14:08:06","date_gmt":"2024-09-30T14:08:06","guid":{"rendered":"https:\/\/teixeiraduarteconstrucao.com\/?post_type=tm_portfolio&#038;p=16992"},"modified":"2024-09-30T14:08:06","modified_gmt":"2024-09-30T14:08:06","slug":"remodelling-of-rio-de-mouro-halt","status":"publish","type":"tm_portfolio","link":"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/remodelling-of-rio-de-mouro-halt\/","title":{"rendered":"Remodelling of Rio de Mouro Halt"},"content":{"rendered":"<h1>REMODELLING OF RIO DE MOURO HALT<\/h1>\n<p><strong>Client<\/strong>: REFER \u2013 Rede Ferrovi\u00e1rina Nacional, E.P<br \/>\n<strong>Location<\/strong>: Rio de Mouro \u2013 Sintra \u2013 Portugal<br \/>\n<strong>Execution Period<\/strong>: 26 Months<\/p>\n<p>&nbsp;<\/p>\n<p>Work integrated in the remodelling of existing railway infrastructures in the Railway line of Sintra and whose object was the remodelling \/ construction of Rio de Mouro halt, with a length of approximately 1.600 meters (between Pk 19+400 and Pk 21+000), including the execution of:<\/p>\n<p>An underground station with an underpass for urban traffic (at km 20.720) and a pedestrian underpass at Pk 20+480, north-west of the station. Both underpasses required the suspension of the track;<br \/>\nExecution of the passengers\u2019 quay in both tracks, with 69 m of useful width and a length of 220 m;<br \/>\nExecution of a full coverage of the station , with a length of 240 m, an useful width of 19,20 m, with no intermediate support points in its inner area, composed of a set of 13 metallic hoofs with opaque and translucent precast parts positioned longitudinally aligned with the track.<br \/>\nExecution of the road &#8211; railway interface with the parking lot for 6 buses, sheltered by a cover with metallic structure with a length of approximately 83 meters and a width of 64 meters and a car park with capacity for 340 cars.<\/p>\n<p>&nbsp;<\/p>\n<div id='gallery-1' class='gallery galleryid-16992 gallery-columns-2 gallery-size-large'><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/2002-Estacao-de-Rio-de-Mouro-1.jpg'><img decoding=\"async\" width=\"847\" height=\"565\" data-src=\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/2002-Estacao-de-Rio-de-Mouro-1-1024x683.jpg\" class=\"attachment-large size-large lazyload\" alt=\"\" data-srcset=\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/2002-Estacao-de-Rio-de-Mouro-1-1024x683.jpg 1024w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/2002-Estacao-de-Rio-de-Mouro-1-300x200.jpg 300w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/2002-Estacao-de-Rio-de-Mouro-1-768x512.jpg 768w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/2002-Estacao-de-Rio-de-Mouro-1-1536x1024.jpg 1536w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/2002-Estacao-de-Rio-de-Mouro-1-2048x1365.jpg 2048w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/2002-Estacao-de-Rio-de-Mouro-1-1200x800.jpg 1200w\" data-sizes=\"(max-width: 847px) 100vw, 847px\" data-id=\"16987\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" style=\"--smush-placeholder-width: 847px; --smush-placeholder-aspect-ratio: 847\/565;\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/2002-Estacao-de-Rio-de-Mouro-2.jpg'><img decoding=\"async\" width=\"847\" height=\"565\" data-src=\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/2002-Estacao-de-Rio-de-Mouro-2-1024x683.jpg\" class=\"attachment-large size-large lazyload\" alt=\"\" data-srcset=\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/2002-Estacao-de-Rio-de-Mouro-2-1024x683.jpg 1024w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/2002-Estacao-de-Rio-de-Mouro-2-300x200.jpg 300w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/2002-Estacao-de-Rio-de-Mouro-2-768x512.jpg 768w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/2002-Estacao-de-Rio-de-Mouro-2-1536x1024.jpg 1536w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/2002-Estacao-de-Rio-de-Mouro-2-2048x1365.jpg 2048w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/2002-Estacao-de-Rio-de-Mouro-2-1200x800.jpg 1200w\" data-sizes=\"(max-width: 847px) 100vw, 847px\" data-id=\"16991\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" style=\"--smush-placeholder-width: 847px; --smush-placeholder-aspect-ratio: 847\/565;\" \/><\/a>\n\t\t\t<\/div><\/figure><figure class='gallery-item'>\n\t\t\t<div class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/2002-Estacao-de-Rio-de-Mouro-4.jpg'><img decoding=\"async\" width=\"847\" height=\"565\" data-src=\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/2002-Estacao-de-Rio-de-Mouro-4-1024x683.jpg\" class=\"attachment-large size-large lazyload\" alt=\"\" data-srcset=\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/2002-Estacao-de-Rio-de-Mouro-4-1024x683.jpg 1024w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/2002-Estacao-de-Rio-de-Mouro-4-300x200.jpg 300w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/2002-Estacao-de-Rio-de-Mouro-4-768x512.jpg 768w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/2002-Estacao-de-Rio-de-Mouro-4-1536x1024.jpg 1536w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/2002-Estacao-de-Rio-de-Mouro-4-2048x1365.jpg 2048w, https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/2002-Estacao-de-Rio-de-Mouro-4-1200x800.jpg 1200w\" data-sizes=\"(max-width: 847px) 100vw, 847px\" data-id=\"16989\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" style=\"--smush-placeholder-width: 847px; --smush-placeholder-aspect-ratio: 847\/565;\" \/><\/a>\n\t\t\t<\/div><\/figure>\n\t\t<\/div>\n\n","protected":false},"featured_media":16987,"template":"","projects":[329,387],"skills":[331,396],"countries":[333,332],"class_list":["post-16992","tm_portfolio","type-tm_portfolio","status-publish","has-post-thumbnail","hentry","tm_portfolio_category-railway-infrastructures","projects-all","projects-railway-infrastructures","skills-all","skills-railway-works","countries-all","countries-portugal-en"],"metadata":{"_wpml_word_count":"{\"total\":230,\"to_translate\":{\"pt-pt\":230}}","_edit_lock":"1727705152:12","_edit_last":"12","_thumbnail_id":"16987","_reactive_geobox_preview":"{}","_wpml_media_has_media":"1","_themetechmount_metabox_group":{"slidertype":"","revslider":"home_PT","customslider":"","slider_width":"wide","custom_background":{"image":"","imageid":"","repeat":"","position":"","attachment":"","size":"","color":""},"custom_inner_background":{"image":"","imageid":"","repeat":"","position":"","attachment":"","size":"","color":""},"show_topbar":"","topbar_bg_color":"","topbar_bg_custom_color":"#dd3333","topbar_text_color":"","topbar_text_custom_color":"rgba(0, 0, 255, 0.25)","topbar_left_text":"","topbar_right_text":"","title":"","subtitle":"","titlebar_bg_custom_options":"custom","titlebar_bg_color":"darkgrey","titlebar_background":{"image":"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/2002-Estacao-de-Rio-de-Mouro-4.jpg","imageid":"16989","repeat":"no-repeat","position":"center top","attachment":"fixed","size":"cover","color":""},"titlebar_font_custom_options":"","titlebar_text_color":"white","titlebar_heading_font":{"family":"Arimo","backup-family":"Arial, Helvetica, sans-serif","variant":"regular","text-transform":"","font-size":"14","line-height":"16","letter-spacing":"0","color":"#202020","font":"google"},"titlebar_subheading_font":{"family":"Arimo","backup-family":"Arial, Helvetica, sans-serif","variant":"regular","text-transform":"","font-size":"14","line-height":"16","letter-spacing":"0","color":"#202020","font":"google"},"titlebar_breadcrumb_font":{"family":"Arimo","backup-family":"Arial, Helvetica, sans-serif","variant":"regular","text-transform":"","font-size":"14","line-height":"16","letter-spacing":"0","color":"#202020","font":"google"},"titlebar_view":"","titlebar_height":"","titlebar_hide_breadcrumb":"","skincolor":"","custom_background_switcher":false,"hide_titlebar":false},"_themetechmount_metabox_sidebar":{"sidebar":"","left_sidebar":"","right_sidebar":""},"themetechmount_page_row_settings":{"row_lower_padding":false},"themetechmount_portfolio_featured":{"featuredtype":"image","video_code":"","audio_code":"","slide_images":""},"themetechmount_portfolio_view":{"viewstyle":""},"themetechmount_portfolio_like":"","_wpb_vc_js_status":"false","_wpml_media_duplicate":"1","_wpml_media_featured":"1","_last_translation_edit_mode":"native-editor","_yoast_wpseo_primary_tm_portfolio_category":"","_yoast_wpseo_content_score":"30","_yoast_wpseo_estimated-reading-time-minutes":"2","_yoast_wpseo_wordproof_timestamp":"","themetechmount_likes":"0","_wpb_post_custom_layout":"default","_reuseb_geobox_preview":"{}","_yoast_wpseo_primary_projects":"","_yoast_wpseo_primary_skills":"","_yoast_wpseo_primary_countries":""},"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.7 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Remodelling of Rio de Mouro Halt - Teixeira Duarte Constru\u00e7\u00e3o<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/remodelling-of-rio-de-mouro-halt\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Remodelling of Rio de Mouro Halt - Teixeira Duarte Constru\u00e7\u00e3o\" \/>\n<meta property=\"og:description\" content=\"REMODELLING OF RIO DE MOURO HALT Client: REFER \u2013 Rede Ferrovi\u00e1rina Nacional, E.P Location: Rio de Mouro \u2013 Sintra \u2013 Portugal Execution Period: 26 Months &nbsp; Work integrated in the remodelling of existing railway infrastructures in the Railway line of Sintra and whose object was the remodelling \/ construction of Rio de Mouro halt, with &hellip; Continue reading Remodelling of Rio de Mouro Halt\" \/>\n<meta property=\"og:url\" content=\"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/remodelling-of-rio-de-mouro-halt\/\" \/>\n<meta property=\"og:site_name\" content=\"Teixeira Duarte Constru\u00e7\u00e3o\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/teixeiraduarteconstrucao\/?locale=pt_PT\" \/>\n<meta property=\"og:image\" content=\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/2002-Estacao-de-Rio-de-Mouro-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2058\" \/>\n\t<meta property=\"og:image:height\" content=\"1372\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/remodelling-of-rio-de-mouro-halt\/\",\"url\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/remodelling-of-rio-de-mouro-halt\/\",\"name\":\"Remodelling of Rio de Mouro Halt - Teixeira Duarte Constru\u00e7\u00e3o\",\"isPartOf\":{\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/remodelling-of-rio-de-mouro-halt\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/remodelling-of-rio-de-mouro-halt\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/2002-Estacao-de-Rio-de-Mouro-1.jpg\",\"datePublished\":\"2024-09-30T14:08:06+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/remodelling-of-rio-de-mouro-halt\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/remodelling-of-rio-de-mouro-halt\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/remodelling-of-rio-de-mouro-halt\/#primaryimage\",\"url\":\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/2002-Estacao-de-Rio-de-Mouro-1.jpg\",\"contentUrl\":\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/2002-Estacao-de-Rio-de-Mouro-1.jpg\",\"width\":2058,\"height\":1372},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/remodelling-of-rio-de-mouro-halt\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"In\u00edcio\",\"item\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Remodelling of Rio de Mouro Halt\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/#website\",\"url\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/\",\"name\":\"Teixeira Duarte Constru\u00e7\u00e3o\",\"description\":\"Pioneirismo e Inova\u00e7\u00e3o desde 1921\",\"publisher\":{\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/#organization\",\"name\":\"Teixeira Duarte - Engenharia e Constru\u00e7\u00f5es, S.A.\",\"url\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2025\/04\/Logotipo-Teixeira-Duarte-EC-2024-positivo.png\",\"contentUrl\":\"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2025\/04\/Logotipo-Teixeira-Duarte-EC-2024-positivo.png\",\"width\":3544,\"height\":1182,\"caption\":\"Teixeira Duarte - Engenharia e Constru\u00e7\u00f5es, S.A.\"},\"image\":{\"@id\":\"https:\/\/teixeiraduarteconstrucao.com\/en\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/teixeiraduarteconstrucao\/?locale=pt_PT\",\"https:\/\/www.linkedin.com\/company\/teixeira-duarte-engenharia-e-construcoes\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Remodelling of Rio de Mouro Halt - Teixeira Duarte Constru\u00e7\u00e3o","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/remodelling-of-rio-de-mouro-halt\/","og_locale":"en_US","og_type":"article","og_title":"Remodelling of Rio de Mouro Halt - Teixeira Duarte Constru\u00e7\u00e3o","og_description":"REMODELLING OF RIO DE MOURO HALT Client: REFER \u2013 Rede Ferrovi\u00e1rina Nacional, E.P Location: Rio de Mouro \u2013 Sintra \u2013 Portugal Execution Period: 26 Months &nbsp; Work integrated in the remodelling of existing railway infrastructures in the Railway line of Sintra and whose object was the remodelling \/ construction of Rio de Mouro halt, with &hellip; Continue reading Remodelling of Rio de Mouro Halt","og_url":"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/remodelling-of-rio-de-mouro-halt\/","og_site_name":"Teixeira Duarte Constru\u00e7\u00e3o","article_publisher":"https:\/\/www.facebook.com\/teixeiraduarteconstrucao\/?locale=pt_PT","og_image":[{"width":2058,"height":1372,"url":"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/2002-Estacao-de-Rio-de-Mouro-1.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/remodelling-of-rio-de-mouro-halt\/","url":"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/remodelling-of-rio-de-mouro-halt\/","name":"Remodelling of Rio de Mouro Halt - Teixeira Duarte Constru\u00e7\u00e3o","isPartOf":{"@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/remodelling-of-rio-de-mouro-halt\/#primaryimage"},"image":{"@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/remodelling-of-rio-de-mouro-halt\/#primaryimage"},"thumbnailUrl":"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/2002-Estacao-de-Rio-de-Mouro-1.jpg","datePublished":"2024-09-30T14:08:06+00:00","breadcrumb":{"@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/remodelling-of-rio-de-mouro-halt\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/remodelling-of-rio-de-mouro-halt\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/remodelling-of-rio-de-mouro-halt\/#primaryimage","url":"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/2002-Estacao-de-Rio-de-Mouro-1.jpg","contentUrl":"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2024\/09\/2002-Estacao-de-Rio-de-Mouro-1.jpg","width":2058,"height":1372},{"@type":"BreadcrumbList","@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/projects\/remodelling-of-rio-de-mouro-halt\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"In\u00edcio","item":"https:\/\/teixeiraduarteconstrucao.com\/en\/"},{"@type":"ListItem","position":2,"name":"Remodelling of Rio de Mouro Halt"}]},{"@type":"WebSite","@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/#website","url":"https:\/\/teixeiraduarteconstrucao.com\/en\/","name":"Teixeira Duarte Constru\u00e7\u00e3o","description":"Pioneirismo e Inova\u00e7\u00e3o desde 1921","publisher":{"@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/teixeiraduarteconstrucao.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/#organization","name":"Teixeira Duarte - Engenharia e Constru\u00e7\u00f5es, S.A.","url":"https:\/\/teixeiraduarteconstrucao.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2025\/04\/Logotipo-Teixeira-Duarte-EC-2024-positivo.png","contentUrl":"https:\/\/teixeiraduarteconstrucao.com\/wp-content\/uploads\/2025\/04\/Logotipo-Teixeira-Duarte-EC-2024-positivo.png","width":3544,"height":1182,"caption":"Teixeira Duarte - Engenharia e Constru\u00e7\u00f5es, S.A."},"image":{"@id":"https:\/\/teixeiraduarteconstrucao.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/teixeiraduarteconstrucao\/?locale=pt_PT","https:\/\/www.linkedin.com\/company\/teixeira-duarte-engenharia-e-construcoes"]}]}},"_links":{"self":[{"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/tm_portfolio\/16992","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/tm_portfolio"}],"about":[{"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/types\/tm_portfolio"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/media\/16987"}],"wp:attachment":[{"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/media?parent=16992"}],"wp:term":[{"taxonomy":"projects","embeddable":true,"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/projects?post=16992"},{"taxonomy":"skills","embeddable":true,"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/skills?post=16992"},{"taxonomy":"countries","embeddable":true,"href":"https:\/\/teixeiraduarteconstrucao.com\/en\/wp-json\/wp\/v2\/countries?post=16992"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}